
¨ Working Surface 10” x 54”
¨ T-Slots Number and Size 3 Slots, 5/8”
¨ 26” Wide Saddle
ü Capacity
¨ Travels (X & Y) 39” x 16.3”
¨ Quill Travel 5”
¨ Ram Travel 18.5”
¨ Knee Travel 15.3”
¨ Throat Distance 9.8” - 28.3”
¨ Spindle Gage line to Tabletop 5.375”-16.9”
ü Spindle
¨ Spindle Motor 3 HP
¨ Wiring Voltage 220V/440V
¨ Spindle Nose Taper R-8
¨ Spindle Variable Speed Drive 60-4,500 Rpm
¨ Quill diameter 3-3/8”
¨ Quill Feed 3 Speed (IPR) 0.0015, 0.003, 0.005
¨ Accuracy 0.0002” TIR
¨ Head Tilt (Rt.. to Left) 90°
¨ Head Tilt (Up and down) 45°
ü Dimensions and Weight
¨ Floor Area (W x D x H) 70”x 75” x 91.78”
¨ Weight 3,000 Lbs.
ü Total Power Consumption
¨ 220V 3 KVA/8 amps
¨ 440V 3 KVA/4 amps
FEATURES:¨ Hardened & Ground Box ways on Column & Saddle for Maximum Rigidity
¨ 3 HP Motor, variable speed head
¨ R-8 Spindle
¨ Knuckle joints using bolts & circular T-slot design; allowing head to swivel left & right, up & down.
¨ Dual fan head cooling System
¨ Double-nut backlash Eliminator
¨ Internal Lubricated Vari-Disc Design
¨ The motor shaft end is supported by a bearing.¨ Manual Draw Bar
¨ Hard-Chromed Ways
¨ Front & Rear Rubber Way Covers
¨ One-shot Lube System
¨ Wired 220V or 440V. Please Specify
¨ Tool Kit:
Machine Manual, Half-Nut Wrench, Wrench 17 mm, 19 mm, Set of 6 Allen Wrenches, Philip Screwdriver, Flat Head, Screwdriver, Oil Can, Grease Gun, Rear Way Cover Bracket, Pin for Indicator, and Can of Paint.
NOTES:· 6” “Kurt” Vise with Swivel Base (DX6 vise & D50-4-SA swivel base) 5000-2126 A $ 1,558.00
· Auto lube pump Auto Lube2 $ 1,028.00
· Right Angle Milling Attachment with Arbor ACC-10TMV-NT30 $ 2,936.00
· Right Angle Milling Attachment with Arbor ACC-10TMV-R8 $ 2,406.00
· “Sharp” Power Table Feed with Safety Handle (X-Axis) * SP-250A (see notes) $ 981.00
· X Axis Installation $ 185.00 NET
· “Sharp” Power Cross Feed with Safety Handle (Y-Axis) SP-250B $ 981.00
· Y Y-Axis installation $ 300.00 NET
· “Sharp” Power Knee Feed with Safety Handle (Z-Axis) SP-250D $ 981.00
Z Axis Installation $ 450.00 NET
* NOTES: SP-250A installation may reduce X-axis travel.
· Drill Chuck & Drill Arbor TMV-D/A $ 594.00
· 6” Riser Block ACC-06 $ 1,325.00
Riser Block Installation $ 210.00 Net
· Coolant System with Chip Pan at Base (pump included) C311/TMV $ 1,028.00
· “Maxi Torque Rite” Power Draw Bar TR-100 $ 1,175.00
Factory Installation $ 215.00 Net
· R-8 Collet (Set of 11) - 1/8”-3/4” BY 1/16” ACC-R8 $ 297.00
· Clamping Kit (52 pcs/Steel Rack) CK-104 $ 286.00
· Halogen Work light WL-110V55W-L $ 297.00
· CE mark net $ 1,839.00
· 380V and 575 V transformer 440T4 $ 1,230.00 Net
· UL (to meet the state of California)
components upgrade with electrical box (factory order) LMV-UL $ 4,282.00 NET
· UL compliance certificate under the State of California $ 5,008.00 NET
· Fowler Mill Head Attachment $ 408.00
Factory Installation $ 100.00 Net
DIGITAL READOUT SYSTEMS:
Fagor DRO
2-Axis X&Y (Fagor 20i) FG-TMV $ 2,141.00
3-Axis X&Y on Quill (Z) (Fagor 30i) FG-TMV-3AQ $ 3,339.00
3-Axis X&Y on Knee (Z) (Fagor 30i) FG-TMV-3AK $ 3,562.00
2 Axis D.R.O. Installation $ 660.00 NET
3 Axis D.R.O. Installation $ 850.00 NET
Acu-Rite 200S DRO
2-Axes X & Y AR-TMV $ 3,994.00
3-Axes X & Y on Quill (Z) AR-TMV-3AQ $ 4,454.00
3-Axes X & Y on Knee (Z) AR-TMV-3AK $ 5,270.00
2 Axis D.R.O. Installation $ 660.00 NET
3 Axis D.R.O. Installation $ 850.00 NET
Newall NMS 800 DRO
2-Axis X & Y NWN-TMV $ 2,300.00
3-Axis X & Y on Quill (Z) NWN-TMV-3AQ $ 3,175.00
Axis X & Y on Knee (Z) NWN-TMV-3AK $ 3,175.00
2 Axis D.R.O. Installation $ 660.00 NET
3 Axis D.R.O. Installation $ 850.00 NET
DELIVERY:Our knowledgeable staff will assist you with all of you questions.
Contact Us